Ringkasan Eksekutif EIA / Industry

LAPORAN PENILAIAN KESAN KEPADA ALAM SEKELILING (EIA) JADUAL KEDUA BAGI CADANGAN PROJEK “PROPOSED INCREASE OF PRODUCTION CAPACITY FOR EXISTING RECYCLED PAPER MILL ON LOT 1, KAWASAN PERINDUSTRIAN BENTONG IIB, SUNGAI DUA, MUKIM SABAI, 28700 BENTONG, PAHANG, MALAYSIA”

Oleh farhanah · 19/12/2020 · 13 paparan

Lokasi
KARAK, PAHANG
Kata kunci
LAPORAN PENILAIAN KESAN KEPADA ALAM SEKELILING (EIA) JADUAL KEDUA BAGI CADANGAN PROJEK “PROPOSED INCREASE OF PRODUCTION CAPACITY FOR EXISTING RECYCLED PAPER MILL ON LOT 1, KAWASAN PERINDUSTRIAN BENTONG IIB, SUNGAI DUA, MUKIM SABAI, 28700 BENTONG, PAHANG, MALAYSIA”
Fail / Media (3)
  • 20231511073835630.jpeg .jpeg Buka
  • 20231511073835645.pdf .pdf Buka
  • 20231511073836104.pdf .pdf Buka

Hubungi Kami
Perpustakaan Enviro Digital @JAS
Aras 1 – 4, Podium 2 & 3,
Wisma Sumber Asli
No.25, Persiaran Perdana, Presint 4
Pusat Pentadbiran Kerajaan Persekutuan
62574 Putrajaya, Malaysia.

Telefon - 03-8871 2000/2200
Emel - [email protected]

Waktu Operasi
Selasa – Khamis:
9.00 Pagi – 4.30 Petang

Jumaat:
9.00 Pagi – 12.15 Tengahari
2:45 Petang - 4.30 Petang

Isnin dan cuti umum - Tutup

Media Sosial JAS