PERPUSTAKAAN ENVIRO DIGITAL Jabatan Alam Sekitar Malaysia
Ringkasan Eksekutif EIA / Others

RINGKASAN EKSEKUTIF UNTUK PROPOSED HYDROPOWER PLANT (24.5 MW) WITH A SMALL SCHEME COVERING AN AREA OF 52.29 HECTARES (129.211 ACRES) AT SUNGAI PELUS & SUNGAI YUM IN KORBU FOREST RESERVE & RPS LEGAP ORANG ASLI RESERVE, MUKIM SUNGAI SIPUT, FOREST DISTRICT OF KUALA KANGSAR, PERAK DARUL RIDZUAN.

08/12/2020 10 hits

Paparan Keseluruhan

Tajuk
RINGKASAN EKSEKUTIF UNTUK PROPOSED HYDROPOWER PLANT (24.5 MW) WITH A SMALL SCHEME COVERING AN AREA OF 52.29 HECTARES (129.211 ACRES) AT SUNGAI PELUS & SUNGAI YUM IN KORBU FOREST RESERVE & RPS LEGAP ORANG ASLI RESERVE, MUKIM SUNGAI SIPUT, FOREST DISTRICT OF KUALA KANGSAR, PERAK DARUL RIDZUAN.
Subjek
jasperakhidroelektriksg pelus
Tahun
2020
Tarikh Keluaran
08/08/2018
Bahasa
MY
Perunding
KenEp Consultancy & Services
Penggerak Projek
PELUS HIDRO SDN BHD
Lokasi
SG SIPUT (U)